Hydrology theme Pilot Audit technical report : Sustainable Rivers Audit
Sustainable Rivers Audit Pilot Audit : Hydrology theme technical report
Pilot Audit technical report : hydrology theme
Knowledge rivers

Responsibility: Murray-Darling Basin Commission
Corporate Author: Murray-Darling Basin Commission (Australia) Sustainable Rivers Audit (Australia)
Place: Canberra
Publisher: Murray-Darling Basin Commission
Date Published: 2004
Series: MDBC publication ; 08/04
Description: xv, 100 p. : ill. (some col.), col. maps ; 30 cm.
Call Number: rga 551.483 H995 b
Subject: Sustainable Rivers Audit (Australia)
Environmental monitoring--Darling River Watershed (Qld. and N.S.W.)
Hydrology--Murray River Watershed (N.S.W.-S. Aust.)
Hydrology--Darling River Watershed (Qld. and N.S.W.)
Environmental monitoring--Murray River Watershed (N.S.W.-S. Aust.)
Stream ecology--Murray River Watershed (N.S.W.-S.Aust.)
Stream ecology--Darling River Watershed (Qld. and N.S.W.)
Rivers--Environmental aspects--Murray River Watershed (N.S.W.-S.Aust.)
Rivers--Environmental aspects--Darling River Watershed (Qld. and N.S.W.)
Contents: --Murray Darling Basin --Environmental auditing --Environmental flows --Measurement --Technical evaluation --Statistics --Hydrology
Australiana: Australiana
Notes: "May 2004" "Knowledge rivers"--Cover. "The purpose of the Pilot Audit was to trial the design recommended by the Cooperative Research Centre for Freshwater Ecology encapsulating five thematic sets of indicators: fish, aquatic macroinvertebrates, hydrology, water quality and physical habitat. The Pilot enabled the proposed methods to be evaluated, confirmed the indicators that could be used in a regular Audit and allowed the costs and logistics of a Basin wide Audit to be estimated."--Foreword. References: p. 84.
Summary: "The purpose of the Pilot Audit was to trial the design recommended by the Cooperative Research Centre for Freshwater Ecology encapsulating five thematic sets of indicators: fish, aquatic macroinvertebrates, hydrology, water quality and physical habitat. The Pilot enabled the proposed methods to be evaluated, confirmed the indicators that could be used in a regular Audit and allowed the costs and logistics of a Basin wide Audit to be estimated."--Foreword.